Sign In | Join Free | My lightneasy.org
China Shenzhen Coming Technology Co., Ltd. logo
Shenzhen Coming Technology Co., Ltd.
LED industrial light specialist www.co-ming.com
Site Member

12 Years

Home > LED Post Top Light >

High Robustness Led Post Top Light PSE CE ROHS Hydrophobic Surface IK10 Highly Efficient System

Shenzhen Coming Technology Co., Ltd.

High Robustness Led Post Top Light PSE CE ROHS Hydrophobic Surface IK10 Highly Efficient System

  • 1
  • 2

Brand Name : G-COMING

Model Number : CO-HALO-L240W

Certification : CE、ETL、DLC、PSE、ROHS、NSF

Place of Origin : China

MOQ : 1 Pcs

Price : Negotiate

Payment Terms : T/T, Western Union

Supply Ability : 8000pcs/month

Packaging Details : Carton

Wattage : 240W

Driver : Meanwell

Lamp Efficiency : 160LM/W±5%

Light Source : Lumileds

CRI : Ra>70/80

CCT : 2700-6500K

Rated Voltage : AC 100-240V 277V~,50/60Hz

Power Factor : >0.95

Beam Angle : 60°/90°/120°

IP Grade : IP66

Size : φ500*168mm

Pole Size : 60/80mm

Contact Now

LED Post Top Light CO-HALO-L

  • Specification:

Product Name CO-HALO-L
Wattage 240W
Driver Meanwell
Lamp Efficiency 160LM/W±5%
Light Source Lumileds
CRI Ra>70/80
CCT 2700-6500K
Rated Voltage AC 100-240V 277V~,50/60Hz
Power Factor >0.95
Beam Angle 60°/90°/120°
IP Grade IP66
Operating Temp -40℃~55℃
Size φ500*168mm
Pole Size 60/80mm

  • Featrue

High Robustness Led Post Top Light PSE CE ROHS Hydrophobic Surface IK10 Highly Efficient SystemHigh Robustness Led Post Top Light PSE CE ROHS Hydrophobic Surface IK10 Highly Efficient System

  • Size

High Robustness Led Post Top Light PSE CE ROHS Hydrophobic Surface IK10 Highly Efficient System

  • Contact us

If you have any question or concern about your order, please feel free to email us. We will try our best to reply all e-mails within 24 hours. However, no emails will be replied during weekends or holidays.

Please allow up to 48 hours delay in receiving our response after long weekends or holidays.

Please contact us for resolutions before leaving negative feedback, we strive to providing the greatest service and bringing the highest satisfaction to all of our customers.

  • Trade Terms

1. Shipping freight is quoted under your requests.

2. Shipping port: Shenzhen, China mainland.

3. Lead time: 3-5 working days for samples, 7-15 working days for big quantity.

4. Discounts are offered based on order quantities.

5. Logo: According to your requirements.

6. MOQ: 1pcs.

  • About Shippment

• All items will be shipped within 2 business days after the payment is cleared.

• All items will be shipped via Post Mail, which normally takes 15-35 days to arrive.

• International shipping requires more complicated shipping procedures (such as both countries customs, transit stations etc.), also will effect by many factors, such as holidays, weather conditions etc, so it will probably take longer time for your items to arrive at the final destination. Thank you for your understanding on this matter.

• Import duties, value added taxes and any other charges are not included in the item price or shipping costs.

Country Delivery Time(Via Post Airmail),Working Days + Saturday + Sunday

North American /West Europe 7~20 days
Eastern Europe 7~35 days
Australia 7~30 days
Central Asia 15~45 days
South American 15~50 days
Eastern Asian 7~20 days
Others 15~60 days

  • SNS:

Facebook: facebook.com/Shenzhen-coming-technology-2049806605293877/

Linkedin: linkedin.com/company/shenzhen-coming-technology-co-ltd

Twitter:twitter.com/LED_GCOMIN


Product Tags:

post top light fittings

      

post top led street lights

      
Buy cheap High Robustness Led Post Top Light PSE CE ROHS Hydrophobic Surface IK10 Highly Efficient System product

High Robustness Led Post Top Light PSE CE ROHS Hydrophobic Surface IK10 Highly Efficient System Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenzhen Coming Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)